MILMANACCESS COMPLIANCE
Home / What changed in AS/NZS 1891.4:2025
Resource · Standards · WA

AS/NZS 1891.4:2025: what changed, and what to do in WA

The 2025 edition of the standard for industrial fall-arrest systems changed how often anchors and static lines are inspected and tested. Here's what it means for buildings in Western Australia, who holds the duty, and what to do this year.

Inspection
Every 12 months
Pull test
Single-fix anchors, every 12 months
Old allowance
Up to 5 years, now removed
Covers
Installed anchors, lines and rails

The short version

  • Installed fall-arrest devices are inspected every 12 months.
  • The old allowance for manufacturers to specify longer intervals, up to five years, has been removed.
  • Anchors with a single fixing are still pull-tested every 12 months.
  • Anchors with more than one fixing no longer need an annual pull test, if the install records, design calculations and manufacturer details are on file.
  • The pull test is 7.5 kN, held for 30 seconds.

What changed, in more detail

One interval for everyone: 12 months

Installed fall-arrest devices, including roof anchors, static lines and rail systems, are inspected at least every 12 months. Under the old edition a manufacturer could set a longer interval, up to five years. That allowance is gone, so a building on a longer cycle is likely overdue now.

Pull tests depend on the anchor and the paperwork

Single-fix anchors are pull-tested every 12 months. Anchors with more than one fixing skip the annual pull test only when the install records, design calculations and manufacturer details are on file. If the records are missing, plan on testing until they're rebuilt.

Records are worth keeping

Because the pull-test exemption depends on paperwork, the install records for your roof now save you money every year. Keep them with the building, not with whoever installed the system.

New anchors are tested on the real roof

AS 5532, the standard for single-point anchors, was updated in 2025 as well, so new anchors are tested on the roof material they're actually fixed to. That affects new installs; it doesn't change the annual inspection.

WA duties

Who is responsible in WA

The standard says what good practice looks like. WA law says who has to make it happen.

BuildingWho usually holds the duty
Office, warehouse or factory you own and runYou, as the business that manages or controls the workplace and its fixtures, under the Work Health and Safety Act 2020 (WA).
Leased commercial buildingUsually shared: the owner for the building's fixtures, the tenant for how its own workers use them. The lease often decides who books the inspection.
Strata schemeThe strata company, for anchors and roof access on common property, under the Strata Titles Act 1985 (WA). Strata guide.
Franchise storeWhoever the lease makes responsible for the roof, usually the franchisee.
Council or school buildingThe council or school, as the organisation that controls the building.
Contractors on the roofEvery contractor is a duty holder too, and has to check an anchor is fit to use before relying on it.

The standard isn't an Act of Parliament. WA's work health and safety laws ask duty holders to manage fall risks so far as is reasonably practicable, the Work Health and Safety (General) Regulations 2022 set out how (regulations 78 to 80), and WorkSafe WA publishes a code of practice on managing the risk of falls. In practice, the current standard and the manufacturer's instructions are what your system will be measured against.

More on who is responsible in WA

Checklist

What to do now

  1. Find the last inspection

    Check the date on the anchor tags or the last report. More than 12 months ago means it's due.

  2. Find the install records

    Ask the installer, builder or previous owner for the records for multi-fixing anchors. They decide whether yearly pull tests are needed.

  3. Check the lease or by-laws

    Make sure it's clear who books and pays: owner, tenant or strata company.

  4. Book the inspection

    Every anchor, line and ladder inspected, tagged and recorded, and failed items taken out of service.

  5. Set a 12-month cycle

    Diary the next one, or let the register remind you before it's due.

How we help

What we do about it

We check what records you have, inspect every item, pull-test where needed, and put the building on a 12-month cycle in the register with a reminder before each one falls due. If an anchor fails or the roof needs more, we install new anchors, lines and walkways too.

Roof anchor inspection · Installation · How we price a job

General information, not legal or engineering advice. Always follow the manufacturer's instructions for your system as well as the standard.

Sources: Standards Australia · Core Inspection · Anchor Safe · WorkSafe WA, PCBU · WorkSafe WA, falls code of practice

Questions

Common questions

Is AS/NZS 1891.4:2025 law in WA?

Not by itself. Australian Standards aren't Acts of Parliament, but WA's work health and safety laws ask duty holders to do what is reasonably practicable, and the current standard and the manufacturer's instructions are what a fall-arrest system will be measured against.

Our anchors were on a five-year cycle. Are they overdue?

If they haven't been inspected in the last 12 months, yes. The 2025 edition removed the allowance for longer manufacturer intervals on installed fall-arrest devices.

Do multi-fixing anchors need a pull test every year?

Not if the install records, design calculations and manufacturer details are on file. Without them, we test.

Does the 2025 change apply to ladders and walkways?

No. Fixed ladders, stairs and walkways fall under AS 1657, which doesn't set one fixed interval. We agree an interval with you based on how the item is used and where it is, and usually inspect it on the same visit.

Who books the inspection on a leased building?

Check the lease. Often the owner books it for building fixtures and recovers the cost through outgoings; sometimes the tenant is responsible. Settle it before the next one falls due.

Get a quote

Not sure where your building stands?

Four quick details and we'll call you back with a fixed price.

We call you back within one business day. Rather talk now? Call 0438 499 825

CallGet a quote