MILMANACCESS COMPLIANCE
Home / Installation
Service · Installation

Roof anchor and access platform installation

New anchors, static lines, roof walkways, access platforms, ladders and guardrail, laid out for your roof, installed by our boilermakers and handed over tagged, certified and on the register.

Anchors and lines
Manufacturer-approved systems
Platforms and walkways
Aluminium or steel, built in our shop
Standards
AS/NZS 5532 · AS/NZS 1891 · AS 1657
You get
Roof plan, certificate, register login
What we install

Safe access to everything on the roof

  • Roof anchors for fall-arrest and restraint, single and multi-fixing
  • Static lines and rail systems along ridges, gutters and plant runs
  • Roof access platforms and crossovers over ducts, pipes and roof sheeting
  • Roof walkways to HVAC units, exhaust fans and plant
  • Fixed ladders, roof ladders and ladder brackets
  • Guardrail and edge protection around plant and roof edges
  • Roof hatches and hatch guardrail
  • Extensions to an existing system, loaded into the register with the original items
How an install works

From roof survey to handover

1. Roof survey

We look at the roof, the plant people need to reach and how they get there. You get a layout and a fixed price.

2. Engineering

Anchors suited to your actual roof material, unknown roof structures checked by a structural engineer, and platforms built to AS 1657.

3. Fabricate and install

Platforms and walkways made in our own shop in aluminium or steel. Anchors and lines installed to the manufacturer's method.

4. Handover

Every item tagged and certified, a roof plan with every anchor pinned, and the lot on the register with its 12-month inspection already booked.

Why us

Built, installed and looked after by the same crew

We're boilermakers, so roof platforms, crossovers and walkways can be made to suit your roof rather than forced from a kit. The crew that installs your system is the crew that inspects it every year after, on the same register, so the records never go missing between contractors. You get a fixed price before any work starts.

Questions

Common questions

Do we need a building permit?

Some roof work does, mainly larger structural installs. We'll tell you at quote stage what applies to your job and arrange it, including a registered builder where one is required.

Can you add to the anchors and lines we already have?

Yes. We inspect and tag what's there, load it into the register, then extend the system so everything sits on one roof plan and one certificate.

How long does an install take?

It depends on the roof. Your quote gives you the days on site and the lead time for parts and fabrication, and we work around your tenants and trading hours.

What happens after the install?

Installed anchors and lines go on a 12-month inspection under AS/NZS 1891.4:2025. We book that in at handover and remind you before it's due. See our inspections.

Get a fixed-price install quote

Roof photos, a plan or an address are enough to start. We call back within one business day.

CallGet a quote